<=== Cage at Crow High School (built 2010)
Building a Cage for the Hammer on a Limited Budget
- Fund raise
- See if you can get poles donated by a local utility company. The front poles need to be 20+ feet tall and the back poles should be about 15+ feet. You really can't make them too tall.
- See if you can get a used net that could be cut down to size.
- An old logging cable that is 100+ feet works great to hang the net.
- See if you can bargain on the price of the concrete.
No comments:
Post a Comment